Our Work

Projects That Speak for Themselves

Over 500 completed projects across 20+ states — each one a measurable step towards a cleaner, healthier India.

81+
Projects Completed
05+
States Covered
78+
Government Clients
06+
Years of Experience
Integrated MSW Management
Completed
Solid Waste

Integrated MSW Management

End-to-end solid waste management system covering 480 tonnes per day of municipal solid waste — from door-to-door collection to scientific landfill closure.

Uttar Pradesh2023
480 TPD
Waste Processed Daily
78%
Diversion from Landfill
3 MRFs
Material Recovery Facilities
River Rejuvenation — Phase I
Completed
River Rejuvenation

River Rejuvenation — Phase I

Interception of 38 major drains discharging into the Gomti, combined with in-situ bioremediation and 14 km of riverbank restoration across Lucknow city.

Uttar Pradesh2024
38 Drains
Intercepted & Treated
14 km
Riverbank Restored
62%
BOD Reduction Achieved
50 MLD Sewage Treatment Plant
Ongoing
Water Treatment

50 MLD Sewage Treatment Plant

Design, build, and operate contract for a 50 MLD SBR-based sewage treatment plant serving with treated water reuse for urban greening.

Madhya Pradesh2023
50 MLD
Treatment Capacity
SBR Technology
Process Adopted
100%
CPCB Compliance
Zero Liquid Discharge — Textile Cluster
Completed
Liquid Waste

Zero Liquid Discharge — Textile Cluster

Common effluent treatment plant with ZLD capability for a cluster of 120 textile dyeing units, eliminating all liquid discharge to the river.

Surat, Gujarat2025
12 Units
Industries Served
Zero
Liquid Discharge Achieved
3 MLD
Water Recycled Daily
Rural Drinking Water — 200 Villages
Completed
Water Treatment

Rural Drinking Water — 200 Villages

Fluoride and TDS removal plants for 200 villages in water-scarce districts, bringing safe drinking water to over 1.5 lakh residents

Uttar Pradesh2025
200 Villages
Communities Served
1.5 Lakh
Residents Benefited
BIS 10500
Water Quality Standard Met
Legacy Dump Remediation
Ongoing
Solid Waste

Legacy Dump Remediation

Scientific remediation of a 15-acre legacy dump site — bio-mining, leachate treatment, gas capture, and progressive green cover restoration over a 2-year programme.

Uttar Pradesh2023
15 Acres
Site Under Remediation
2-Year
Programme Duration
Bio-mining
Technology Deployed